Western wall brickwork and windows

The western wall (facing the bookstore) has brickwork up to the third floor level. Some of the first window panes are now installed in the third floor windows.

Another set of trucks with precast fixtures from the plant in Mexico arrived this week. Crews are starting to unload the flatbeds around the perimeter of the building so that the a crane can be brought back and more easily lift them into position.
IMG_3384 2