Tag Archives: newsroom

Newsroom raised flooring installed

Although students and staff were off for the holiday season, construction crews were hard at work. Among the myriad of areas that underwent change over the break, one of the most dramatic was the completion of wiring and installation of … Continue reading

Posted in Interior Construction | Tagged , , , | Leave a comment

Precast fixtures installed on front of building

Today several large pieces of precast concrete were installed along Childs way. These are over large openings that open into the media center where groups including  Annenberg’s student news outlets (ATVN, ARN and NeonTommy) are going to be producing a … Continue reading

Posted in Exterior Construction | Tagged , , , , , | Leave a comment

Media center’s large windows framed

The north side of the building (facing the PED building) will have large windows that will provide a great backdrop to the new media center which will house a converged newsroom for Annenberg TV News, Annenberg Radio News, Neon Tommy … Continue reading

Posted in Exterior Construction | Tagged , , | Leave a comment

First floor panoramic

This panoramic was taken from the southeast corner of the building, standing in what will be the broadcast studio. On the left is the corridor that runs along the south side of the newsroom. On the right will be the … Continue reading

Posted in Uncategorized | Tagged , , | Leave a comment