Tag Archives: fireproofing

Second floor prepped for fireproofing

The green tarps are now enclosing the second floor as workers prepare to start fireproofing that floor.

Posted in Steel Structure and Foundation | Tagged , , | Leave a comment

First floor fireproofing

Fireproofing continues on the first floor. The fireproof material is sprayed onto exposed steel and workers use pin testers to ensure that there’s enough material covering each section.

Posted in Interior Construction | Tagged | 1 Comment

First floor wrapped in green tarps for fireproofing

The first floor is shrouded in a set of green tarps since fireproofing of the exposed steel structure should be underway soon. The tarps are necessary since the fireproofing is a gypsum-based plaster that is sprayed into place.

Posted in Uncategorized | Tagged , , | Leave a comment