LADWP water connection established

Late last night (and this morning) crews completed the building’s water connections to the LADWP lines. The work went without a hitch and passed city inspections ahead of schedule. This paves the way for electricity to be turned on in the building now that fire suppression is available.
water connection

 

This entry was posted in Exterior Construction and tagged , , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>