First steel beams arrive

 

img_8063The first of the steel beams that will make up the retaining walls are delivered. Each are labeled with their location in reference to the perimeter of the building.

 

This entry was posted in Uncategorized and tagged , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>