First precast installed on western face

The first pieces of precast concrete that were delivered last week are being installed on the western face of the building. You can check out the live progress on the Live Construction Camera page

image13-10-23_09-17-35-46

This entry was posted in Exterior Construction and tagged . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>