IMG_3501 - Version 2Today concrete crews filled the first half of the molds for the Watt Way street. Over a dozen workers and a concrete pump crew worked throughout the morning to fill the molds. They completed the pour several with plenty of time before a rain storm hit.

The remainder of the street will be poured in the next week or so after the first section has had brickwork added.
IMG_3506 - Version 2 IMG_3510 - Version 2

This entry was posted in Exterior Construction and tagged , , . Bookmark the permalink.