First exterior walls ready for shotcrete

The the first and second floors along the eastern and part of the southern walls with drywall and rebar installed are ready for shotcrete.
The shotcrete will be applied like it was along the basement walls. See here for more information about those previous shotcrete applications.

IMG_8497 IMG_8512

This entry was posted in Exterior Construction and tagged . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>