Category Archives: Interior Construction

Classroom millwork installed (cont.)

Since the initial install of millwork in the parliamentary-style classrooms in the lower level (May 30 - Classroom millwork installed), finishing crews have added laminate and other finishes and are now ready for final coats of paint on the walls and … Continue reading

Posted in Interior Construction | Tagged , , , | Leave a comment

Classroom A/V install

For the last several months audio-visual contractors have been preparing classroom spaces for installation of A/V systems. This included hanging projectors, running cables, installing wall boxes, and more. The actual equipment was prepared off site and was delivered already mounted … Continue reading

Posted in Interior Construction | Tagged , , | Leave a comment

Cafe nearing completion

In addition to the installation of glass display cabinets, crews also completed counter installations and the wood facade. The cafe will be the first permanent food venue for Annenberg. In the existing Annnberg building the only food service is the … Continue reading

Posted in Interior Construction | Tagged , , , | Leave a comment

Auditorium progress

The auditorium (lower level) is in the final phases of completion. The final maple wall paneling is being installed and the seats (although still in boxes) are in rows. In the next couple of weeks the artwork will be installed, … Continue reading

Posted in Interior Construction | Tagged , , , | Leave a comment

Media center carpet and furniture installed

In rapid succession, the carpet in the media center was installed, floor boxes for data and power put into place, and then the furniture arrived and was installed. With these installations the media center is looking very close to being … Continue reading

Posted in Interior Construction | Tagged , , | Leave a comment

Classroom millwork installed

Several of the classrooms including two parliamentary-style (pictured below) are having millwork installed. As soon as the millwork is in place, finishing crews will add laminate and other finishes.

Posted in Interior Construction | Tagged , , | Leave a comment

Colored LEDs tested for forum

Today several members of the architectural firm, signage, and Annenberg staff evaluated various LED options for the forum’s walkway in an effort to bring additional color to the space.

Posted in Interior Construction | Tagged , , | Leave a comment

Media center’s halo populated with TVs

The media center’s “halo” is having the TVs installed. The halo sits over the assignment desk and includes two rows of TVs that provide 360 degree views for those working in the media center on both the first and second … Continue reading

Posted in Interior Construction | Tagged , , , | Leave a comment

Soundproofing material installed in broadcast areas

Workers are installing the final broadcast area’s sound proofing material (the radio studio is pictured below). This material will help dampen sound and provide acoustical reinforcement. The second phase of this is a more eye-appealing gray that will go over … Continue reading

Posted in Interior Construction | Tagged , , , | Leave a comment

Mounting interior signage

For the last month, signage consultants have been mounting paper templates with room numbers. Starting today, some of the final signage is being installed. These signs include Braille and have a background pattern that is part of the overall building identity … Continue reading

Posted in Interior Construction | Tagged | Leave a comment