Back from Blogging Hiatus – Wallis Annenberg Hall is Now in Use

Thank you to everyone who read, viewed, clicked, linked and generally enjoyed the “Building” Wallis Annenberg Hall blog during the twenty-eight month period when the blog was most active.

As regular readers have noted, the blog went on hiatus July 15. This corresponded in part to a major push to complete Wallis Annenberg Hall in time for the Fall 2014 semester.

The building did indeed open — from classrooms to offices to the converged Media Center, to the tech-instructional Digital Lounge.  to drop-in collaborative spaces galore to The Cafe featuring Illy coffee, to so much more.

A formal Grand Opening Ceremony will take place Wednesday, October 1 @12pm. RSVP here.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>