Move In Day

Today marks the first of the official move in days. The movers are going to be moving in support staff and their materials and then moving onto faculty offices. To help move all of necessary items, professional movers were contracted … Continue reading

Posted in Interior Construction | Tagged | Leave a comment

Seating woodwork installation

Several areas (including the Forum) have benches that are skinned in wood that matches the decor. These benches are made of concrete and have been perviously leveled. Now a specialized crew is adding the finished wood to the seats. This … Continue reading

Posted in Interior Construction | Tagged , , | Leave a comment

Studio sets construction

Several of the studios have custom millwork (furniture) for sets. A designer and fabricator are working on bringing in and configuring sections that have been fabricated offsite. Currently Studio A’s desk (with LED strips) is installed on the massive rotating … Continue reading

Posted in Interior Construction | Tagged , | Leave a comment

First wave of equipment training

Last week was the beginning of the series of training sessions for the large production systems in the media center. These systems include the video switcher, audio transport system, media halo, and intercom system to name just a few. The … Continue reading