Daily Archives: April 11, 2014

Update: Drilling holes for basement railings

As mentioned previously, the holes for the basement railings were drilled and were waiting for railings to be installed. Installation crews wasted no time and have already installed the railings leading from the first floor down to the basement.

Posted in Interior Construction | Tagged | Leave a comment