Daily Archives: April 7, 2014

Man lift removed

After continuous use as the primary method of moving men and materials up and down for over a year, the man lift was finally removed. The removal involved using a crane to remove sections of the lift track, mechanical setup … Continue reading

Posted in Exterior Construction | Tagged | Leave a comment

Main elevator passes inspection

Late this week the main elevator passed inspection and began general operation. This process included testing of the elevator system with weights simulating various loads, emergency stopping capability and a thorough inspection by both the elevator installers as well as … Continue reading

Posted in Interior Construction | Tagged , | 1 Comment