Monthly Archives: September 2013

Electricians busy on first floor

Teams of electricians are working on adding electrical fixtures throughout the building, but currently very active on the first floor. The first floor is the furtherest along, even to the point that sections of walls are completely installed and can … Continue reading

Posted in Interior Construction | Tagged , , | Leave a comment

Exterior weather proofing continues

Exterior weather proofing continues on the south and west sides of the building as precast fixtures are continuously added to the eastern face.

Posted in Exterior Construction | Tagged , | Leave a comment

First precast fixture installed

The first large piece of precast concrete installed along the east wall of the new Wallis Annenberg Hall. Over the next few months, crews will install precast fixtures from ground to roof and on all sides of the building.

Posted in Exterior Construction | Tagged , , | Leave a comment

Additional sealing around windows on the eastern wall

With the completion of the eastern wall’s vapor barrier (bright blue sheeting), crews are adding the finishing touches by applying a special sealant around where the windows will be installed.

Posted in Exterior Construction | Tagged , , , | Leave a comment

Fabrication of precast exterior pieces almost done, shipping underway

At the concrete precast plant in Tecate on Tuesday August 27, almost all of the Annenberg exterior precast panels are completed. The final fabrication continues at full speed. The yard is full of panels ready to ship (see photos). The … Continue reading

Posted in Exterior Construction | Tagged , , , | Leave a comment

Live construction cameras

Want to see what’s going on right now with the construction? No problem, check out our two live video streams from the construction site here. The camera views are from the top of the PED building (facing south) and the HED … Continue reading

Posted in Exterior Construction | Tagged , | Leave a comment