Parents tour the new building site

As part of the 2013 Welcome Week events, parents of Annenberg students went on hard hat tours of the construction site. For more photos of the tours and the ongoing construction process visit the ANN Construction photo gallery.

Posted in Tour | Tagged , | Leave a comment

East side of building with vapor barrier install

The east side of the building (facing the bookstore) is the first wall to have patches of blue water resistive membrane that helps create a vapor barrier. The metal structure that the brick exterior will mount to is starting to … Continue reading

Posted in Exterior Construction | Tagged , | Leave a comment

Plastic sheeting up – more shotcrete being applied

The large sections of plastic sheeting are up so that crews can apply shotcrete to the north face of the building. This will bring completed shotcrete up to the third floor level.

Posted in Exterior Construction | Tagged , | Leave a comment

South side shotcrete and gable work

Crews continue to work on shotcreting the southern face of the building. Additional crews begin working on the gables, adding rebar to strengthen the structure so that brickwork can be added later.