Daily Archives: August 19, 2013

East side of building with vapor barrier install

The east side of the building (facing the bookstore) is the first wall to have patches of blue water resistive membrane that helps create a vapor barrier. The metal structure that the brick exterior will mount to is starting to … Continue reading

Posted in Exterior Construction | Tagged , | Leave a comment