Daily Archives: April 26, 2013

First floor wrapped in green tarps for fireproofing

The first floor is shrouded in a set of green tarps since fireproofing of the exposed steel structure should be underway soon. The tarps are necessary since the fireproofing is a gypsum-based plaster that is sprayed into place.

Posted in Uncategorized | Tagged , , | Leave a comment