Monthly Archives: March 2013

Third and fourth floor steel going into place

 

Posted in Uncategorized | Tagged | Leave a comment

View from the basement up to the fourth floor

Posted in Uncategorized | Tagged , , | Leave a comment

Third and fourth floor steel going in

The third and fourth floor steel structure are being flown in via crane. Mocking ups of the brick facade. The third and fourth floor steel erection going up

Posted in Uncategorized | Tagged , , | Leave a comment

Future main entrance

A panoramic from the second floor facing north towards what will the be main entrance.  

Posted in Uncategorized | Tagged , | Leave a comment

Steel decking installed on floors one and two, prepping for concrete pours

Posted in Uncategorized | Tagged , , , | Leave a comment

Steel Decking

With the steel frame for the first and second floors installed, crews are now spreading out steel deck or just “decking” that will form the floors for each level. This decking was lifted into place as a stack as each … Continue reading

Posted in Uncategorized | Tagged , , | Leave a comment

Beam preparation

Steel workers rigging and modifying a beam prior to being flown into place. Footage is sped up to 250% actual time.

Posted in Uncategorized | Tagged , | Leave a comment

Flying in steel beams

This what it looks like from the beam’s point of view as it’s flown into location by the crane driver and secured in place by the connecting crew.

Posted in Uncategorized | Tagged , , | Leave a comment